首页  >  教授与研究  >  科技与运营  >  藕继红  

藕继红

OU Jihong

美国麻省理工学院运营研究学博士
77779193永利官网运营管理学副教授

Email:
jhou@ckgsb.edu.cn

下载个人简历

教授简介:

藕继红在中国科学院数学研究所取得硕士学位后,留美在麻省理工学院获得运营研究学博士学位。目前为77779193永利官网运营管理学副教授,此前是新加坡国立大学商学院副教授,也曾是剑桥大学、加州大学洛杉矶分校安德森管理学院和伊利诺依大学访问学者。藕继红教授的课程包括统计学与决策分析,管理科学,运营管理,供应链管理,随机运营研究模型等。

主要研究领域

藕继红的理论研究专注于排队理论及随机运营研究模型。他也在生产与库存系统,工业工程,企业流程化管理,供应链管理等应用研究领域颇有建树。

主要学术成果

  1. The Impact of Processing Time Knowledge on Dynamic Job-Shop Scheduling Management Science 37(1991) 1002-1014 (with L. M. Wein)
  2. On the Improvement from Scheduling a Two-Station Queuing Network in Heavy TrafficOperations Research Letters 11(1992) 225-232 (with L. M. Wein)
  3. Performance Bounds for Scheduling Queueing Networks Annals of Applied Probability2(1992) 460-480 (with L. M. Wein)
  4. Dynamic Scheduling of a Production/Inventory System With By-Products and Random YieldsManagement Science 41(1995) 1000-1017 (with L. M. Wein)
  5. Characterizing the Idle-Period Distribution of GI/G/1 Queues Journal of Applied Probability 32 (1995) 247-255 (with J. Li)
  6. Sequential Screening In Semiconductor Manufacturing, II: Exploiting Lot-to-Lot VariabilityOperations Research 44 (1996) 196-204 (with L. M. Wein)
  7. Approximating a Cumulative Distribution Function by Generalized Hyperexponential Distributions Probability in Engineering and Information Sciences 11 (1997) 11-18 (with J. Li and S. Ozekici)
  8. Yield Comparison of Push and Pull Control Methods On Production Systems With Unreliable Machines International Journal on Production Economics 50 (1997) 1-12 (with J. Jiang)
  9. The Throughput of Irreducible Closed Markovian Queuing Networks: Functional Bounds, Asymptotic Loss, Efficiency, and the Harrison-Wein Conjectures Mathematics of Operations Research 22 (1997) 886-920 (with H. Jin and P.R.Kumar)
  10. The Delay of Open Markovian Queuing Networks: Uniform Functional Bounds, Heavy Traffic Pole Multiplicities, and Stability Mathematics of Operations Research 50 (1997) 921-954 (with C. Humes and P.R. Kumar)
  11. Multi-Item Inventory Staggering Problems: Bounds and Heuristics Proceedings of 1998 ACM-SIAM Symposium on Discrete Algorithms (with C. Teo and K. Tan)
  12. Impact On Inventory Cost With Consolidation of Distribution Centers IIE Transactions 33 (2001), 99-110 (with M. Goh and C. Teo)
  13. ST Logistics: Distribution Consumer Goods in China International Transactions in Operations Research 8 (2001) 203-220 (With F. Chen, M. Goh, J. Lee, S. Moosa, C.P. Teo, and P.G. Goh)
  14. A Warehouse Sizing Model Balancing Inventory and Warehousing Costs Naval Logistics Research Quarterly 48(2001) 299-312 (with M. Goh and C. Teo)
  15. An Optimization Based Approach to the Train Operator Scheduling Problem at Singapore MRTAnnals of Operations Research 108 (2001) 111-122 (with J. Pang, K.L. Chew, Q. Liu, and C.P. Teo)
  16. Inventory Cost Effect of Consolidating Several One-Warehouse Multi-Retailer SystemsOperations Research 51(2003) 668-672 (with W.S. Lim and C. P. Teo)
  17. Benefits of Providing Amenities to Impatient Waiting Customers Computers and Operations Research 30(2003) 2211-2225 (with B. M. Rao)
  18. The Benefits of Advanced Booking Discount Programs: Model and Analysis Management Science 50(2004) 465-478 (with C. S. Tang, K. Rajaram, and A. Alptekinoglu)
  19. Stability of Data Networks: Stationary and Bursty Model Operations Research 53(2005) 107-125 (with H. Ye and X. Yuan)
  20. Management of Inventory Replenishment and Available Offerings for Goods Sold with Optional Value-Added Packages IIE Transactions 37 (2005) 397-406 (with F. Chen and Y. Feng)
  21. Optimal Positioning of Idle Elevators Under Myopic and State-dependent Policies European Journal of Operational Research 170 (2006) 863-886 (with M. Parlar and S. Moosa)
  22. Joint Management of Finished Goods Inventory and Demand Process for a Make to-Stock Product: A Computational Approach IEEE Transactions on Automatic Control 51 (2006) 258-273 (with L. Chen and Y. Feng)
  23. A Differential Service Scheme to Optimize Website Revenues Journal of the Operational Research Society 57 (2006) 1323-1340 (with M. Parlar and S. Moosa)
  24. Service Performance Analysis and Improvement for a Ticket Queue with Balking Customers,Management Science 53 (2007) 971-990 (with L. Gao and S. Xu)
  25. Coordination of Stocking Decisions in an Assemble to Order Environment European Journal of Operational Research 189 (2008) 540-558 (with S. Gilbert and X. Zhang)
  26. Optimal Control of Price and Production in an Assemble-to-Order System, Operations Research Letters 36 (2008) 506-512 (with Y. Feng and P. Zhan)
  27. Coordinating Batch Production and Pricing Control of a Make-to-Stock Product, IEEE Transactions on Automatic Control 54 (2009) 1674-1680 (with L. Chen and Y. Feng)
  28. Analysis of Ticket Queues with Reneging Customers, submitted to Production and Operations Management (with D. Ding and J. Ang)
  29. Distribution Channel Structure for Chain-to-Chain Competition with Price and Lead-time Sensitive Demand, submitted to Management Science (with L. Chen and Z. Wu)
  30. Analysis of Push and Pull Contracts in an ATO Supply Chain, in preparation (with L. Chen and D. Ding)